Subscribe to newsletter

Partners

  • Hosokawa Micron BV

    Systems for mechanical and thermal processing of dry and wet powders

  • REMBE GmbH

    Developer and manufacturer of top of the range safety and measurement products

  • Dinnissen BV

    International specialist in the world of bulk materials and process technology

  • Hense Wägetechnik GmbH

    Individual advice and efficient solutions for the whole weighing technology process

  • Schutte-Buffalo Hammermill

    Designer and manufacturer of custom engineered size reduction machinery

  • Martin Engineering

    Systems for cleaner, safer and more productive handling of bulk materials

  • Hapman

    Leading manufacturer of conveyors and material handling equipment

  • Dec Group

    Dec is a leading global manufacturer of powder handling and containment systems

  • Doubrava GesmbH & Co KG

    Doubrava is one of the world's leading names in industrial plant constructions

  • Klinkenberg Zaanstad B.V.

    Klinkenberg BV is specialized in internal transport and bulk handling using screw conveyors

  • VAC-U-MAX

    Pneumatic systems and support equipment for conveying, weighing and batching of dry materials

HomeSupplier NewsProduct NewsTrain sand box filling is a ...

Product News

Train sand box filling is a vital safety issue

12 July 2012 - 713 views

DARMSTADT - The re-filling of sand boxes or hoppers on trains and trams is an important factor to ensure the correct operation of the vehicle’s braking system and to assist with traction when there is slippy track conditions.

In many train and tram depots the sand is refilled manually which can take a significant amount of time. One solution is the installation of a Schenck Process SandPiper mobile sand filling station that is electically operated and pneumatically pumps the sand from an on-board 500kg capacity hopper.

The SandPiper product range is the only UK designed and manufactured sand filling pumping system which can also be installed as a fixed system with multiple fixed dispensing points from a centrally located large capacity pneumatic pump and storage silo. Recent projects for the SandPiper products include London Underground and Southern Trains depots in south London.

The Southern Train installation has been operational for over 9 years and Gerry McFadden, the Southern Fleet Director, recently commented that “Southern Railway are very pleased with the centralised sand pumping stations that were installed as they save time in the refilling of the sand boxes and increase the efficient of our depot operation to carry out an important key process”.

View the latest Reference List of Schenck Process installations (PDF)

View Sand Handling Solutions Brochure for Static or Mobile systems (PDF)

More information SandPiper - Train & Tram Sand Filling Solutions

© Schenck Process GmbH / BulkInside 

See video

This article is published by Schenck Process GmbH

Acting locally to support your needs Schenck Process is working where you are. Schenck Process are global market leaders of solutions in measuring and process technologies in industrial weighing, feeding, screening and automation. With an unrivalled ...

View company page